Site icon SRJ News

BR Goyal Infrastructure IPO: Overview, Price Band, GMP, and Key Insights

BR Goyal Infrastructure IPO: Overview, Price Band, GMP, and Key Insights

BR Goyal Infrastructure, a well-known name in infrastructure development, is all set to launch its initial public offering (IPO). This exciting opportunity opens for bidding on Tuesday, January 7, 2025, offering investors a chance to participate in the company’s journey. Here’s everything you need to know about the IPO, the company’s business operations, and its growth potential.


Key IPO Details

Detail Information
IPO Opening Date January 7, 2025
IPO Closing Date January 9, 2025
Price Band Rs 128-135 per share
Lot Size Minimum 1,000 shares and multiples thereafter
Total Issue Size Rs 85.21 crore
Type of Issue 100% fresh equity sale of 63,12,000 shares
Listing Date January 14, 2025
Stock Exchange BSE SME Platform

About BR Goyal Infrastructure

Incorporated in 2005, BR Goyal Infrastructure is headquartered in Indore, Madhya Pradesh. The company is engaged in developing infrastructure projects, including roads, highways, bridges, and buildings. Over the years, BR Goyal has built a reputation for its expertise in Engineering, Procurement, and Construction (EPC) projects and its integrated approach, supported by an experienced design and engineering team and an in-house Ready-Mix Concrete (RMC) unit.

Milestones and Operations:

  1. Wind Energy Venture: In 2005, the company installed a 1.25 MW wind power turbine in Jaisalmer, Rajasthan, marking its entry into renewable energy.
  2. RMC Unit: Located in Indore, the unit boasts an annual capacity of 1.80 lakh cubic meters of concrete.
  3. Equipment and Fleet: As of September 30, 2024, BR Goyal operates with over 199 construction vehicles and equipment.

Financial Performance

Financial Metric 4 Months (Ended July 2024) FY 2023-24
Revenue Rs 156.86 crore Rs 596.19 crore
Net Profit Rs 1.95 crore Rs 21.89 crore
Market Capitalization Rs 321.63 crore

Allocation and Investment Options

Investor Type Allocation Percentage Minimum Investment
Qualified Institutional Buyers (QIBs) 50%
Non-Institutional Investors (NIIs) 15% Rs 2,70,000 (2 lots)
Retail Investors 35% Rs 1,35,000 (1 lot)

Retail investors can apply for a single lot of 1,000 equity shares costing Rs 1,35,000, while non-retail investors must apply for at least 2 lots costing Rs 2,70,000.

MUST READ: Standard Glass Lining IPO Fully Subscribed Within 20 Minutes, GMP Surges to 70%


Broker and Market Insights


BR Goyal Infrastructure’s robust growth and diversification into renewable energy and RMC production make it a compelling IPO to watch. The grey market premium and strategic allocation to retail and institutional investors further enhance its appeal. However, potential investors should perform thorough research and consult with financial advisors before investing.

Disclaimer

This article is for informational purposes only and does not constitute financial or investment advice. Always consult with a financial advisor before making investment decisions.

Click here to know more.

Exit mobile version